Knock down and rebuild · Grantham

Knock down and rebuild in Grantham

Our knock down and rebuild service covers Grantham and the rest of Lincolnshire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Grantham

Alongside Grantham, we also cover Newark-on-Trent, Melton Mowbray (14 miles to the south-west) and Oakham.

Homes in the East Midlands

Across the East Midlands you find everything from city terraces to modern estates and stone villages, so the right extension depends a lot on the street and the materials around it.

What do you get with a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Planning application for the replacement dwelling
  • Asbestos survey, demolition notice and service disconnections
  • Demolition and site clearance

What is the guide price for a knock down and rebuild in Grantham?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Grantham?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council.

What can change the price or programme?

  • Planning policy on replacement dwellings varies, especially in green belt and countryside.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Do I need planning permission?

Yes, for the replacement dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Grantham?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Grantham.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote