Knock down and rebuild · Newark-on-Trent

Knock down and rebuild in Newark-on-Trent

Knock down and rebuild in Newark-on-Trent from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Newark-on-Trent

Newark-on-Trent sits 16 miles north-east of Nottingham, with Grantham 13 miles to the south-east and Arnold 14 miles to the west.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What goes into a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Demolition and site clearance
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Newark-on-Trent?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a knock down and rebuild in Newark-on-Trent

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

How do I get a price for knock down and rebuild in Newark-on-Trent?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Newark-on-Trent.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote