Knock down and rebuild · Greenford

Knock down and rebuild in Greenford

Planning knock down and rebuild in Greenford? We design and build them for houses across London, and we fix the price for the agreed specification in writing before any building work starts.

Covering Greenford

Greenford is about 10 miles west of London. We also cover Northolt (1 miles to the north), Southall and Brent.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What do you get with a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

How much should I budget for a knock down and rebuild?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Greenford?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council.

What can change the price or programme?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Knock down and rebuild: common questions

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Who deals with the council for a project in Greenford?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Greenford.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote