Covering Hawick
We work in Hawick (TD9) and the places around it, including Selkirk, Galashiels and Kelso.
Because the Scottish Borders covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the Scottish Borders
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What is a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Building warrant application and completion certificate
- Asbestos survey, demolition notice and service disconnections
- Reconnection of services and landscaping
How much does a knock down and rebuild cost in Hawick?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in Hawick?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What should Hawick homeowners check first?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- You will need somewhere to live for most of a year.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Can you visit a house in Hawick to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Selkirk
- Knock down and rebuild in Galashiels
- Knock down and rebuild in Kelso
- Knock down and rebuild in Peebles
Learn more about knock down and rebuild, or see every project we cover in Hawick.

