Covering Kelso
We work in Kelso (TD5) and the places around it, including Galashiels, Selkirk and Hawick.
Because the Scottish Borders covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the Scottish Borders
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What do you get with a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Feasibility: rebuild versus extend and renovate
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
What will a knock down and rebuild cost?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Planning and building rules in Kelso
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What should Kelso homeowners check first?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Knock down and rebuild: common questions
Do I need planning permission?
Yes, for the replacement dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Kelso?
Yes. Kelso is within our coverage for knock down and rebuild, along with nearby Galashiels and Selkirk.
Also covering
- Knock down and rebuild in Galashiels
- Knock down and rebuild in Selkirk
- Knock down and rebuild in Hawick
- Knock down and rebuild in Haddington
Learn more about knock down and rebuild, or see every project we cover in Kelso.

