Knock down and rebuild · Holloway

Knock down and rebuild in Holloway

We take on knock down and rebuild in Holloway as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Holloway

Our coverage around Holloway (N7) also includes Highbury (1 miles to the east) and Archway.

Homes in London

Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.

What is a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Demolition and site clearance
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Planning and building rules in Holloway

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a knock down and rebuild in Holloway

How long does it take?

Around 36 to 60 weeks including demolition.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

How do I get a price for knock down and rebuild in Holloway?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Holloway.