Covering March
March sits 14 miles east of Peterborough, with Wisbech 8 miles to the north and Peterborough 14 miles to the west.
Homes in the East of England
Housing in the East of England ranges from post-war estates and modern developments to timber-framed and period homes in historic towns, so permitted development checks and conservation controls both feature regularly.
What goes into a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
What is the guide price for a knock down and rebuild in March?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in March?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should March homeowners check first?
- You will need somewhere to live for most of a year.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about a knock down and rebuild in March
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
How long does it take?
Around 36 to 60 weeks including demolition.
Can you visit a house in March to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- Knock down and rebuild in Wisbech
- Knock down and rebuild in Peterborough
- Knock down and rebuild in King's Lynn
- Knock down and rebuild in Spalding
Learn more about knock down and rebuild, or see every project we cover in March.