Covering Spalding
Our coverage around Spalding (PE11) also includes Boston (14 miles to the north) and Peterborough.
Homes in the East Midlands
Across the East Midlands you find everything from city terraces to modern estates and stone villages, so the right extension depends a lot on the street and the materials around it.
What goes into a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Demolition and site clearance
- Reconnection of services and landscaping
What is the guide price for a knock down and rebuild in Spalding?
What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council.
What can affect a knock down and rebuild?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Spalding?
Yes. Spalding is within our coverage for knock down and rebuild, along with nearby Boston and Peterborough.
Also covering
- Knock down and rebuild in Boston
- Knock down and rebuild in Peterborough
- Knock down and rebuild in Wisbech
- Knock down and rebuild in March
Learn more about knock down and rebuild, or see every project we cover in Spalding.

