Knock down and rebuild · Seaford

Knock down and rebuild in Seaford

Planning knock down and rebuild in Seaford? We design and build them for houses across East Sussex, and we fix the price for the agreed specification in writing before any building work starts.

Covering Seaford

Seaford is about 11 miles east of Brighton. We also cover Rottingdean (8 miles to the west), Eastbourne and Hailsham.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What does a knock down and rebuild involve?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Asbestos survey, demolition notice and service disconnections

What is the guide price for a knock down and rebuild in Seaford?

What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Seaford?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

Who deals with the council for a project in Seaford?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Seaford.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote