Covering Stourbridge
Stourbridge is about 10 miles west of Birmingham. We also cover Brierley Hill (2 miles to the north-east), Dudley and Halesowen.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What does a knock down and rebuild involve?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Feasibility: rebuild versus extend and renovate
- New foundations, structure and full fit-out
- Reconnection of services and landscaping
What is the guide price for a knock down and rebuild in Stourbridge?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in Stourbridge?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What should I think about before starting?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
How do I get a price for knock down and rebuild in Stourbridge?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Knock down and rebuild near Stourbridge
- Knock down and rebuild in Brierley Hill
- Knock down and rebuild in Dudley
- Knock down and rebuild in Halesowen
- Knock down and rebuild in Tipton
Learn more about knock down and rebuild, or see every project we cover in Stourbridge.