Knock down and rebuild · Tenby

Knock down and rebuild in Tenby

Knock down and rebuild in Tenby from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Tenby

Tenby sits 21 miles south-west of Carmarthen, with Pembroke Dock 10 miles to the west and Haverfordwest 14 miles to the north-west.

Homes in Dyfed

Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.

What do you get with a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Planning and building regulations checks under Welsh rules
  • Planning application for the replacement dwelling
  • Demolition and site clearance

What will a knock down and rebuild cost?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Tenby?

In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.

This needs full planning permission from your council in Wales.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

Do I need planning permission?

Yes, for the replacement dwelling.

Can you visit a house in Tenby to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Tenby.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote