New-build homes · Bath

New-build homes in Bath

New-build homes for homes in Bath and the surrounding parts of Somerset, designed around your house and built by our teams under a single written contract.

Covering Bath

Our coverage around Bath (BA1) also includes Trowbridge (8 miles to the south-east) and Kingswood.

Homes in the South West

Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.

What is included in a new-build home in Bath?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Design, planning application and discharge of conditions
  • Building regulations design and warranty liaison
  • Superstructure, roof, windows and external finishes

How much does a new-build home cost in Bath?

Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

How is a new-build home approved in Bath?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should Bath homeowners check first?

  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
  • Planning conditions often need discharging before work starts.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

New-build homes: common questions

Can you help with planning on a plot?

Yes. We appraise the plot, prepare the design and submit the application.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Do you work in Bath?

Yes. Bath is within our coverage for new-build homes, along with nearby Trowbridge and Kingswood.

Other towns nearby

Learn more about new-build homes, or see every project we cover in Bath.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote