Covering Somerset
Our new-build homes service in Somerset covers Bath, Weston-super-Mare, Taunton and Yeovil and more.
Homes in the South West
In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.
What goes into a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Plot appraisal and feasibility
- Groundworks, services and drainage connections
- Full internal fit-out and landscaping
What will a new-build home cost?
Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
How is a new-build home approved in Somerset?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What can affect a new-build home?
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
- Planning conditions often need discharging before work starts.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Who deals with the council for a project in Somerset?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
New-build homes in nearby towns
- New-build homes in Bath
- New-build homes in Weston-super-Mare
- New-build homes in Taunton
- New-build homes in Yeovil
- New-build homes in Bridgwater
- New-build homes in Portishead
- New-build homes in Frome
- New-build homes in Burnham-on-Sea
- New-build homes in Clevedon
Learn more about new-build homes, or see every project we cover in Somerset.

