Covering Brent
Brent is about 8 miles north-west of London. We also cover Wembley (0 miles to the east), Harrow and Greenford.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What is a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Design, planning application and discharge of conditions
- Superstructure, roof, windows and external finishes
- Full internal fit-out and landscaping
How much should I budget for a new-build home?
Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
How is a new-build home approved in Brent?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can affect a new-build home?
- Most lenders want a structural warranty or architect’s certificate on a new home.
- Planning conditions often need discharging before work starts.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about a new-build home in Brent
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Can you visit a house in Brent to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
New-build homes near Brent
- New-build homes in Wembley
- New-build homes in Harrow
- New-build homes in Greenford
- New-build homes in Northolt
Learn more about new-build homes, or see every project we cover in Brent.

