Covering Buckinghamshire
Our coverage across Buckinghamshire includes Milton Keynes, High Wycombe, Aylesbury and Bletchley.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What goes into a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Design, planning application and discharge of conditions
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
How much should I budget for a new-build home?
Guide prices for new-build homes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Do you need permission for a new-build home in Buckinghamshire?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council.
What can affect a new-build home?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Most lenders want a structural warranty or architect’s certificate on a new home.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Questions about a new-build home in Buckinghamshire
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
Can you visit a house in Buckinghamshire to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- New-build homes in Milton Keynes
- New-build homes in High Wycombe
- New-build homes in Aylesbury
- New-build homes in Bletchley
- New-build homes in Amersham
- New-build homes in Beaconsfield
- New-build homes in Buckingham
- New-build homes in Princes Risborough
Learn more about new-build homes, or see every project we cover in Buckinghamshire.

