Covering Christchurch
We work in Christchurch (BH23) and the places around it, including Bournemouth, New Milton and Poole.
Homes in the South West
The South West mixes stone and render cottages, Victorian terraces in the larger towns and modern estates, and many historic centres are conservation areas where materials and roof shapes are closely controlled.
What does a new-build home involve?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Plot appraisal and feasibility
- Building regulations design and warranty liaison
- Superstructure, roof, windows and external finishes
What will a new-build home cost?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Do you need permission for a new-build home in Christchurch?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council.
What should Christchurch homeowners check first?
- Most lenders want a structural warranty or architect’s certificate on a new home.
- Planning conditions often need discharging before work starts.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
New-build homes: common questions
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do you work in Christchurch?
Yes. Christchurch is within our coverage for new-build homes, along with nearby Bournemouth and New Milton.
New-build homes in nearby towns
- New-build homes in Bournemouth
- New-build homes in New Milton
- New-build homes in Poole
- New-build homes in Wimborne Minster
Learn more about new-build homes, or see every project we cover in Christchurch.

