New-build homes · New Milton

New-build homes in New Milton

Homeowners in New Milton can get new-build homes from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering New Milton

New Milton sits 15 miles south-west of Southampton, with Christchurch 5 miles to the west and Bournemouth 10 miles to the west.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What is a new-build home?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Design, planning application and discharge of conditions
  • Building regulations design and warranty liaison
  • Full internal fit-out and landscaping

How much does a new-build home cost in New Milton?

Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Do you need permission for a new-build home in New Milton?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council.

What should I think about before starting?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Most lenders want a structural warranty or architect’s certificate on a new home.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

New-build homes: common questions

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

Do I need a structural warranty?

If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.

How do I get a price for new-build homes in New Milton?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about new-build homes, or see every project we cover in New Milton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote