New-build homes · Clevedon

New-build homes in Clevedon

New-build homes in Clevedon from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Clevedon

Alongside Clevedon, we also cover Portishead, Weston-super-Mare (8 miles to the south-west) and Newport.

Homes in the South West

The South West mixes stone and render cottages, Victorian terraces in the larger towns and modern estates, and many historic centres are conservation areas where materials and roof shapes are closely controlled.

What is a new-build home?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Plot appraisal and feasibility
  • Groundworks, services and drainage connections
  • Superstructure, roof, windows and external finishes

What is the guide price for a new-build home in Clevedon?

Typical ranges for new-build homes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Do you need permission for a new-build home in Clevedon?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • Most lenders want a structural warranty or architect’s certificate on a new home.
  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is VAT charged on building a new house?

Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Can you visit a house in Clevedon to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about new-build homes, or see every project we cover in Clevedon.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote