Covering Gateshead
Gateshead is about 1 miles south-east of Newcastle upon Tyne. We also cover Newcastle upon Tyne (1 miles to the north-west), Felling and Gosforth.
Homes in the North East
The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.
What is included in a new-build home in Gateshead?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Plot appraisal and feasibility
- Building regulations design and warranty liaison
- Groundworks, services and drainage connections
How much does a new-build home cost in Gateshead?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
What approvals does a new-build home need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council.
What should I think about before starting?
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
- Planning conditions often need discharging before work starts.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
How do I get a price for new-build homes in Gateshead?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
New-build homes near Gateshead
- New-build homes in Newcastle upon Tyne
- New-build homes in Felling
- New-build homes in Gosforth
- New-build homes in Wallsend
Learn more about new-build homes, or see every project we cover in Gateshead.

