New-build homes · Tyne and Wear

New-build homes in Tyne and Wear

Homeowners across Tyne and Wear can get new-build homes from one company: the design, the council approvals and the building work.

Covering Tyne and Wear

Our new-build homes service in Tyne and Wear covers Newcastle upon Tyne, Sunderland, South Shields and Gateshead and more.

Homes in the North East

The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.

What does a new-build home involve?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Design, planning application and discharge of conditions
  • Groundworks, services and drainage connections
  • Superstructure, roof, windows and external finishes

What will a new-build home cost?

Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Do you need permission for a new-build home in Tyne and Wear?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What can affect a new-build home?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Most lenders want a structural warranty or architect’s certificate on a new home.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Can you visit a house in Tyne and Wear to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about new-build homes, or see every project we cover in Tyne and Wear.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote