New-build homes · Hamilton

New-build homes in Hamilton

Planning new-build homes in Hamilton? We design and build them for houses across Lanarkshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Hamilton

Our coverage around Hamilton (ML3) also includes Motherwell (2 miles to the north-east) and Wishaw.

Homes in Lanarkshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What goes into a new-build home?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Building warrant application and completion certificate
  • Design, planning application and discharge of conditions
  • Superstructure, roof, windows and external finishes

How much should I budget for a new-build home?

Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Planning and building rules in Hamilton

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

This needs planning permission and a building warrant from your council in Scotland before work starts.

What should I think about before starting?

  • Most lenders want a structural warranty or architect’s certificate on a new home.
  • Planning conditions often need discharging before work starts.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Do I need a structural warranty?

If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.

Who deals with the council for a project in Hamilton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about new-build homes, or see every project we cover in Hamilton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote