New-build homes · Kettering

New-build homes in Kettering

Planning new-build homes in Kettering? We design and build them for houses across Northamptonshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Kettering

We work in Kettering (NN16) and the places around it, including Wellingborough, Corby and Rushden.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What goes into a new-build home?

A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.

  • Building regulations design and warranty liaison
  • Groundworks, services and drainage connections
  • Superstructure, roof, windows and external finishes

What is the guide price for a new-build home in Kettering?

Guide prices for new-build homes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Planning and building rules in Kettering

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What can affect a new-build home?

  • Most lenders want a structural warranty or architect’s certificate on a new home.
  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

How do I get a price for new-build homes in Kettering?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

New-build homes in nearby towns

Learn more about new-build homes, or see every project we cover in Kettering.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote