Covering Wellingborough
Alongside Wellingborough, we also cover Rushden, Kettering (7 miles to the north) and Northampton.
Homes in the East Midlands
Across the East Midlands you find everything from city terraces to modern estates and stone villages, so the right extension depends a lot on the street and the materials around it.
What do you get with a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Plot appraisal and feasibility
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
How much should I budget for a new-build home?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
What approvals does a new-build home need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What should I think about before starting?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Planning conditions often need discharging before work starts.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How much does it cost to build a new house?
Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Can you visit a house in Wellingborough to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
New-build homes near Wellingborough
- New-build homes in Rushden
- New-build homes in Kettering
- New-build homes in Northampton
- New-build homes in Corby
Learn more about new-build homes, or see every project we cover in Wellingborough.

