Covering Peebles
Our coverage around Peebles (EH45) also includes Galashiels, Selkirk and Bonnyrigg.
Projects in the Scottish Borders are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the Scottish Borders
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What does a new-build home involve?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Plot appraisal and feasibility
- Design, planning application and discharge of conditions
- Superstructure, roof, windows and external finishes
How much does a new-build home cost in Peebles?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Peebles
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
This needs planning permission and a building warrant from your council in Scotland before work starts.
What should I think about before starting?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Planning conditions often need discharging before work starts.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Can you help with planning on a plot?
Yes. We appraise the plot, prepare the design and submit the application.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
How do I get a price for new-build homes in Peebles?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- New-build homes in Galashiels
- New-build homes in Selkirk
- New-build homes in Bonnyrigg
- New-build homes in Dalkeith
Learn more about new-build homes, or see every project we cover in Peebles.

