Homes in the Scottish Borders
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Plot appraisal and feasibility
- Design, planning application and discharge of conditions
- Full internal fit-out and landscaping
How much does a new-build home cost in Selkirk?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Selkirk
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What should I think about before starting?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Most lenders want a structural warranty or architect’s certificate on a new home.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
Who deals with the council for a project in Selkirk?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
New-build homes near Selkirk
- New-build homes in Galashiels
- New-build homes in Hawick
- New-build homes in Peebles
- New-build homes in Kelso
Learn more about new-build homes, or see every project we cover in Selkirk.