Covering Southall
Our coverage around Southall (UB1) also includes Greenford, Heston and Hayes.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What does a new-build home involve?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Building regulations design and warranty liaison
- Superstructure, roof, windows and external finishes
- Full internal fit-out and landscaping
What is the guide price for a new-build home in Southall?
Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
What approvals does a new-build home need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council.
What can change the price or programme?
- Most lenders want a structural warranty or architect’s certificate on a new home.
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
New-build homes: common questions
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Can you visit a house in Southall to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
New-build homes near Southall
- New-build homes in Greenford
- New-build homes in Heston
- New-build homes in Hayes
- New-build homes in Isleworth
Learn more about new-build homes, or see every project we cover in Southall.

