Covering Tynemouth
Tynemouth is about 8 miles north-east of Newcastle upon Tyne. We also cover North Shields (1 miles to the west), South Shields and Whitley Bay.
Homes in the North East
Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.
What is a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Design, planning application and discharge of conditions
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
How much does a new-build home cost in Tynemouth?
Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
How is a new-build home approved in Tynemouth?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council.
What should I think about before starting?
- Most lenders want a structural warranty or architect’s certificate on a new home.
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
Do you work in Tynemouth?
Yes. Tynemouth is within our coverage for new-build homes, along with nearby North Shields and South Shields.
Also covering
- New-build homes in North Shields
- New-build homes in South Shields
- New-build homes in Whitley Bay
- New-build homes in Jarrow
Learn more about new-build homes, or see every project we cover in Tynemouth.

