Covering Stranraer
We work in Stranraer (DG9) and the places around it, including Bangor, Carrickfergus and Newtownards.
Projects in Dumfries and Galloway are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in Dumfries and Galloway
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What do you get with an orangery?
We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.
- Building warrant application and completion certificate
- Planning or permitted development check
- Glazed roof lantern and windows or doors
How much should I budget for an orangery?
What orangeries typically cost. These are guide ranges; the written quote for your house replaces them.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
How is an orangery approved in Stranraer?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.
What should I think about before starting?
- Timber-look aluminium or timber frames suit period houses.
- Heating should be part of the house system, not a plug-in heater.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Does an orangery need building regulations?
Usually yes, because it is built as part of the house rather than as a separated conservatory.
Can it be used in winter?
Yes. It is insulated and heated like any other room.
Can you visit a house in Stranraer to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Orangeries in nearby towns
Learn more about orangeries, or see every project we cover in Stranraer.

