Covering Airdrie
We work in Airdrie (ML6) and the places around it, including Coatbridge, Motherwell and Cumbernauld.
Homes in Lanarkshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What does re-roofing involve?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Building warrant application and completion certificate
- Breathable membrane and new battens
- Fascias, soffits and guttering if required
How much should I budget for re-roofing?
Typical ranges for re-roofing. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
How is re-roofing approved in Airdrie?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.
What should Airdrie homeowners check first?
- Heavier tiles than the original can overload old rafters.
- Bats can roost in roofs; if signs are found, work pauses for advice.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Can you visit a house in Airdrie to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
Learn more about re-roofing, or see every project we cover in Airdrie.

