Re-roofing · Kelso

Re-roofing in Kelso

Re-roofing for homes in Kelso and the surrounding parts of the Scottish Borders, designed around your house and built by our teams under a single written contract.

Covering Kelso

Alongside Kelso, we also cover Galashiels, Selkirk (16 miles to the west) and Hawick.

Projects in the Scottish Borders are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.

Homes in the Scottish Borders

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What is re-roofing?

Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.

  • Building warrant application and completion certificate
  • Strip old covering and check timbers
  • New tiles or slates, ridge and verge

What will re-roofing cost?

Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Re-roofingGuide price incl. VAT
Terraced house£6,000 to £10,000
Semi-detached house£8,000 to £15,000
Detached house£12,000 to £25,000

Do you need permission for re-roofing in Kelso?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.

What can change the price or programme?

  • Bats can roost in roofs; if signs are found, work pauses for advice.
  • Insulation upgrades at the same time can cut heat loss significantly.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How long does it take?

One to three weeks for most houses, weather permitting.

Should I replace the fascias at the same time?

Usually yes, because the scaffolding is already up.

Can you visit a house in Kelso to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Re-roofing near Kelso

Learn more about re-roofing, or see every project we cover in Kelso.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote