Covering Peckham
Peckham is about 3 miles south-east of London. We also cover Brixton (2 miles to the west), Greenwich and Catford.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What is included in re-roofing in Peckham?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Roof survey and quotation
- Scaffolding and edge protection
- New tiles or slates, ridge and verge
What will re-roofing cost?
Use these ranges to budget for re-roofing; the survey turns them into a fixed price for the agreed specification.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Planning and building rules in Peckham
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Replacing a roof covering like for like does not usually need planning permission in England. Conservation areas with Article 4 directions and listed buildings are the exceptions.
What should I think about before starting?
- Neighbouring roofs on semis and terraces need careful junction details.
- Bats can roost in roofs; if signs are found, work pauses for advice.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Re-roofing: common questions
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Who deals with the council for a project in Peckham?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Re-roofing near Peckham
Learn more about re-roofing, or see every project we cover in Peckham.

