Side return extensions · Arnold

Side return extensions in Arnold

If you live in Arnold and want side return extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Arnold

Arnold sits 3 miles north of Nottingham, with Nottingham 3 miles to the south and Hucknall 4 miles to the north-west.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What is included in a side return extension in Arnold?

Side returns are small in area but heavy in detail: party walls, a glazed roof, and steelwork to take out the original back wall. We design the roof for light and drainage, agree the party wall process early, and keep the work tidy because access is often through the house.

  • Party wall notices and surveyor liaison
  • Structural steel to remove the side wall
  • Glazed or solid roof with rooflights

How much does a side return extension cost in Arnold?

Guide prices for side return extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

Do you need permission for a side return extension in Arnold?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.

What should Arnold homeowners check first?

  • Access is often through the house, so we plan deliveries and protect floors.
  • Glazed roofs need careful detailing against the neighbour’s wall.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Is a glazed roof too hot in summer?

Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.

How long does a side return take?

About 10 to 14 weeks on site.

Do you work in Arnold?

Yes. Arnold is within our coverage for side return extensions, along with nearby Nottingham and Hucknall.

Side return extensions near Arnold

Learn more about side return extensions, or see every project we cover in Arnold.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote