Covering Runcorn
Runcorn sits 12 miles north-east of Chester, with Widnes 1 miles to the north and Speke 5 miles to the west.
Homes in the North West
The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.
What goes into a side return extension?
Side returns are small in area but heavy in detail: party walls, a glazed roof, and steelwork to take out the original back wall. We design the roof for light and drainage, agree the party wall process early, and keep the work tidy because access is often through the house.
- Party wall notices and surveyor liaison
- Structural steel to remove the side wall
- Underfloor heating ready screed if wanted
How much does a side return extension cost in Runcorn?
What side return extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Side return extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,350 to £3,700 per m² |
| Good specification | £3,700 to £4,150 per m² |
| High specification | £4,150 to £4,550 per m² |
What approvals does a side return extension need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should Runcorn homeowners check first?
- Glazed roofs need careful detailing against the neighbour’s wall.
- Many terraces sit in conservation areas, where side extensions need planning permission.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Side return extensions: common questions
Will I need a party wall agreement?
Most likely, because the new wall usually sits on or near the boundary. We serve the notices and work with your neighbour’s surveyor if one is appointed.
How long does a side return take?
About 10 to 14 weeks on site.
Who deals with the council for a project in Runcorn?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Side return extensions in nearby towns
- Side return extensions in Widnes
- Side return extensions in Speke
- Side return extensions in Great Sankey
- Side return extensions in Huyton
Learn more about side return extensions, or see every project we cover in Runcorn.

