Covering Speke
Speke is about 7 miles south-east of Liverpool. We also cover Garston (2 miles to the west), Runcorn and Widnes.
Homes in the North West
Across the North West, Victorian terraces, inter-war semis and modern estates all feature, and brick or stone matching is chosen to suit each street.
What does a side return extension involve?
A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.
- Party wall notices and surveyor liaison
- Structural steel to remove the side wall
- Glazed or solid roof with rooflights
How much does a side return extension cost in Speke?
Typical ranges for side return extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Side return extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,350 to £3,700 per m² |
| Good specification | £3,700 to £4,150 per m² |
| High specification | £4,150 to £4,550 per m² |
What approvals does a side return extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should I think about before starting?
- Most side returns touch a shared boundary, so the Party Wall etc. Act 1996 usually applies in England and Wales.
- Many terraces sit in conservation areas, where side extensions need planning permission.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Side return extensions: common questions
Is a glazed roof too hot in summer?
Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.
How long does a side return take?
About 10 to 14 weeks on site.
Do you work in Speke?
Yes. Speke is within our coverage for side return extensions, along with nearby Garston and Runcorn.
Also covering
- Side return extensions in Garston
- Side return extensions in Runcorn
- Side return extensions in Widnes
- Side return extensions in Huyton
Learn more about side return extensions, or see every project we cover in Speke.