Side return extensions · Stranraer

Side return extensions in Stranraer

From the first site visit to the final building control sign-off, we manage side return extensions in Stranraer so you only have one company to deal with.

Covering Stranraer

Stranraer is about 57 miles west of Dumfries. We also cover Bangor (30 miles to the south-west), Carrickfergus and Newtownards.

Projects in Dumfries and Galloway are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.

Homes in Dumfries and Galloway

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What is a side return extension?

A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.

  • Building warrant application and completion certificate
  • Structural steel to remove the side wall
  • Drainage and new gully positions

How much does a side return extension cost in Stranraer?

Guide prices for side return extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

What approvals does a side return extension need in Scotland?

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered. Whatever the planning position, you need a building warrant from the council before any building work starts, and a completion certificate at the end.

What can change the price or programme?

  • Glazed roofs need careful detailing against the neighbour’s wall.
  • Many terraces sit in conservation areas, where side extensions need planning permission.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a side return extension in Stranraer

Is a glazed roof too hot in summer?

Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.

How long does a side return take?

About 10 to 14 weeks on site.

Who deals with the council for a project in Stranraer?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Side return extensions in nearby towns

Learn more about side return extensions, or see every project we cover in Stranraer.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote