Covering Stratford
Stratford sits 6 miles east of London, with Bow 1 miles to the south-west and Canning Town 2 miles to the south-east.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What does a side return extension involve?
Side returns are small in area but heavy in detail: party walls, a glazed roof, and steelwork to take out the original back wall. We design the roof for light and drainage, agree the party wall process early, and keep the work tidy because access is often through the house.
- Glazed or solid roof with rooflights
- Underfloor heating ready screed if wanted
- Plastering and making good to the old house
How much does a side return extension cost in Stratford?
What side return extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Side return extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,350 to £3,700 per m² |
| Good specification | £3,700 to £4,150 per m² |
| High specification | £4,150 to £4,550 per m² |
What approvals does a side return extension need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What can affect a side return extension?
- Glazed roofs need careful detailing against the neighbour’s wall.
- Many terraces sit in conservation areas, where side extensions need planning permission.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Does a side return need planning permission?
In England it can be permitted development if it is single storey, no higher than 4 m and no wider than half the original house. Conservation areas are the main exception.
How long does a side return take?
About 10 to 14 weeks on site.
How do I get a price for side return extensions in Stratford?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Side return extensions near Stratford
- Side return extensions in Bow
- Side return extensions in Canning Town
- Side return extensions in Leytonstone
- Side return extensions in Ilford
Learn more about side return extensions, or see every project we cover in Stratford.

