Covering Wakefield
We work in Wakefield (WF1, WF90) and the places around it, including Ossett, Dewsbury and Morley.
Homes in Yorkshire and the Humber
Across Yorkshire and the Humber, older stone and brick terraces sit alongside inter-war semis and newer estates, and dormers and rear extensions are designed to suit each.
What does a single-storey extension involve?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Planning or lawful development certificate where needed
- Brickwork, roof, glazing and insulation
- First-fix and second-fix electrics, plastering and making good
What will a single-storey extension cost?
What single-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
How is a single-storey extension approved in Wakefield?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What can affect a single-storey extension?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Kitchens and doors have long lead times, so we order them early.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Single-storey extensions: common questions
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Do you need to dig up the drains?
Sometimes. If a public sewer runs under the extension, the water company has to agree a build-over or a diversion. We check this at survey stage.
Who deals with the council for a project in Wakefield?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Single-storey extensions in Ossett
- Single-storey extensions in Dewsbury
- Single-storey extensions in Morley
- Single-storey extensions in Batley
Learn more about single-storey extensions, or see every project we cover in Wakefield.

