Covering Aberdeen and Aberdeenshire
Our coverage across Aberdeen and Aberdeenshire includes Aberdeen, Peterhead, Inverurie and Fraserburgh.
Homes in Aberdeen and Aberdeenshire
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What does a structural alteration involve?
We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.
- Building control application and inspections
- Temporary works and propping
- Fire protection and plaster encasement
What is the guide price for a structural alteration in Aberdeen and Aberdeenshire?
Guide prices for structural alterations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
How is a structural alteration approved in Aberdeen and Aberdeenshire?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
Internal alterations rarely need planning permission in Scotland, but structural work needs a building warrant before it starts.
What can affect a structural alteration?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Pipes and cables in the wall need rerouting first.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Structural alterations: common questions
How do I know if a wall is load-bearing?
We check on site and confirm with the structural engineer.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Can you visit a house in Aberdeen and Aberdeenshire to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Structural alterations in nearby towns
- Structural alterations in Aberdeen
- Structural alterations in Peterhead
- Structural alterations in Inverurie
- Structural alterations in Fraserburgh
- Structural alterations in Stonehaven
- Structural alterations in Banchory
Learn more about structural alterations, or see every project we cover in Aberdeen and Aberdeenshire.

