Covering Aberdeen
Our coverage around Aberdeen (AB10, AB11, AB12) also includes Stonehaven, Inverurie and Banchory.
Homes in Aberdeen and Aberdeenshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is included in a structural alteration in Aberdeen?
We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.
- Building warrant application and completion certificate
- Fire protection and plaster encasement
- Making good floors, walls and ceilings
How much does a structural alteration cost in Aberdeen?
What structural alterations typically cost. These are guide ranges; the written quote for your house replaces them.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
How is a structural alteration approved in Aberdeen?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
Internal alterations rarely need planning permission in Scotland, but structural work needs a building warrant before it starts.
What should Aberdeen homeowners check first?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Can the steel be hidden in the ceiling?
Often it can be set within the floor depth, avoiding a downstand. The engineer confirms what is possible.
How do I get a price for structural alterations in Aberdeen?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Structural alterations in Stonehaven
- Structural alterations in Inverurie
- Structural alterations in Banchory
- Structural alterations in Peterhead
Learn more about structural alterations, or see every project we cover in Aberdeen.

