Covering County Tyrone
We cover County Tyrone, including Omagh, Strabane, Dungannon and Cookstown.
Homes in County Tyrone
Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.
What do you get with a structural alteration?
We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.
- Planning and building control applications to the council
- Steel beam installation on padstones
- Fire protection and plaster encasement
How much should I budget for a structural alteration?
Typical ranges for structural alterations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
What approvals does a structural alteration need in Northern Ireland?
Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.
Internal alterations rarely need planning permission in Northern Ireland, but structural work needs building control approval.
What can affect a structural alteration?
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
- Pipes and cables in the wall need rerouting first.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How do I know if a wall is load-bearing?
We check on site and confirm with the structural engineer.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
How do I get a price for structural alterations in County Tyrone?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Structural alterations in Omagh
- Structural alterations in Strabane
- Structural alterations in Dungannon
- Structural alterations in Cookstown
Learn more about structural alterations, or see every project we cover in County Tyrone.

