Covering Lanarkshire
We cover Lanarkshire, including East Kilbride, Hamilton, Cumbernauld and Coatbridge, and the towns around them.
Homes in Lanarkshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is included in a structural alteration in Lanarkshire?
Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.
- Building warrant application and completion certificate
- Fire protection and plaster encasement
- Making good floors, walls and ceilings
What will a structural alteration cost?
Use these ranges to budget for structural alterations; the survey turns them into a fixed price for the agreed specification.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
Do you need permission for a structural alteration in Lanarkshire?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Internal alterations rarely need planning permission in Scotland, but structural work needs a building warrant before it starts.
What should I think about before starting?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Pipes and cables in the wall need rerouting first.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about a structural alteration in Lanarkshire
Do I need building regulations approval to remove a wall?
Yes, for any load-bearing wall. Non-structural partitions usually do not need approval.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Who deals with the council for a project in Lanarkshire?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Structural alterations in nearby towns
- Structural alterations in East Kilbride
- Structural alterations in Hamilton
- Structural alterations in Cumbernauld
- Structural alterations in Coatbridge
- Structural alterations in Airdrie
- Structural alterations in Motherwell
- Structural alterations in Rutherglen
- Structural alterations in Cambuslang
- Structural alterations in Wishaw
Learn more about structural alterations, or see every project we cover in Lanarkshire.

