Covering Longton
Longton sits 3 miles south-east of Stoke-on-Trent, with Stoke-on-Trent 3 miles to the north-west and Newcastle-under-Lyme 4 miles to the west.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What do you get with a wraparound extension?
A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.
- Party wall process with both neighbours if needed
- Steel frame or goalpost for the corner opening
- Glazing, insulation, plastering and electrics
How much does a wraparound extension cost in Longton?
Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
What approvals does a wraparound extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What can change the price or programme?
- Both neighbours may need party wall notices.
- Roof water from an L-shape needs careful falls and outlets.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Wraparound extensions: common questions
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Glazed roof or solid roof?
A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.
Do you work in Longton?
Yes. Longton is within our coverage for wraparound extensions, along with nearby Stoke-on-Trent and Newcastle-under-Lyme.
Other towns nearby
- Wraparound extensions in Stoke-on-Trent
- Wraparound extensions in Newcastle-under-Lyme
- Wraparound extensions in Kidsgrove
- Wraparound extensions in Stafford
Learn more about wraparound extensions, or see every project we cover in Longton.

