Wraparound extensions · Stamford Hill

Wraparound extensions in Stamford Hill

Homeowners in Stamford Hill can get wraparound extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Stamford Hill

Alongside Stamford Hill, we also cover Highbury, Tottenham (2 miles to the north) and Holloway.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What do you get with a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Party wall process with both neighbours if needed
  • Glazing, insulation, plastering and electrics
  • Optional kitchen supply and installation

How much does a wraparound extension cost in Stamford Hill?

Guide prices for wraparound extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

How is a wraparound extension approved in Stamford Hill?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.

What should Stamford Hill homeowners check first?

  • Both neighbours may need party wall notices.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Wraparound extensions: common questions

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can we keep part of the kitchen working?

Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.

Can you visit a house in Stamford Hill to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about wraparound extensions, or see every project we cover in Stamford Hill.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote