Wraparound extensions · Washington

Wraparound extensions in Washington

Planning wraparound extensions in Washington? We design and build them for houses across Tyne and Wear, and we fix the price for the agreed specification in writing before any building work starts.

Covering Washington

Washington is about 6 miles south-east of Newcastle upon Tyne. We also cover Chester-le-Street (4 miles to the south-west), Felling and Houghton-le-Spring.

Homes in the North East

The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.

What does a wraparound extension involve?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Party wall process with both neighbours if needed
  • Pitched, flat or glazed roof with rooflights
  • Optional kitchen supply and installation

How much does a wraparound extension cost in Washington?

Use these ranges to budget for wraparound extensions; the survey turns them into a fixed price for the agreed specification.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

How is a wraparound extension approved in Washington?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What can affect a wraparound extension?

  • Roof water from an L-shape needs careful falls and outlets.
  • An open-plan space this size needs a heating plan, often underfloor heating.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Do you work in Washington?

Yes. Washington is within our coverage for wraparound extensions, along with nearby Chester-le-Street and Felling.

Wraparound extensions in nearby towns

Learn more about wraparound extensions, or see every project we cover in Washington.