Covering Tyne and Wear
Our coverage across Tyne and Wear includes Newcastle upon Tyne, Sunderland, South Shields and Gateshead.
Homes in the North East
In the North East, terraces, semis and bungalows all offer room to extend, with stone-built villages and conservation areas in parts of County Durham and Northumberland.
What is included in a wraparound extension in Tyne and Wear?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Pitched, flat or glazed roof with rooflights
- Glazing, insulation, plastering and electrics
- Optional kitchen supply and installation
What will a wraparound extension cost?
Use these ranges to budget for wraparound extensions; the survey turns them into a fixed price for the agreed specification.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
What approvals does a wraparound extension need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What can affect a wraparound extension?
- Roof water from an L-shape needs careful falls and outlets.
- An open-plan space this size needs a heating plan, often underfloor heating.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about a wraparound extension in Tyne and Wear
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Glazed roof or solid roof?
A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.
Do you work in Tyne and Wear?
Yes. Tyne and Wear is within our coverage for wraparound extensions, along with nearby Newcastle upon Tyne and Sunderland.
Other towns nearby
- Wraparound extensions in Newcastle upon Tyne
- Wraparound extensions in Sunderland
- Wraparound extensions in South Shields
- Wraparound extensions in Gateshead
- Wraparound extensions in Washington
- Wraparound extensions in Tynemouth
- Wraparound extensions in Wallsend
- Wraparound extensions in Newburn
- Wraparound extensions in North Shields
- Wraparound extensions in Whitley Bay
- Wraparound extensions in Houghton-le-Spring
- Wraparound extensions in Felling
- Wraparound extensions in Jarrow
- Wraparound extensions in Gosforth
- Wraparound extensions in Hebburn
Learn more about wraparound extensions, or see every project we cover in Tyne and Wear.