Bungalow and upward extensions · Chiswick

Bungalow and upward extensions in Chiswick

We take on bungalow and upward extensions in Chiswick as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Chiswick

Chiswick sits 6 miles west of London, with Acton 1 miles to the north-west and Barnes 1 miles to the south.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What does an upward extension involve?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Structural survey of walls and foundations
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

How is an upward extension approved in Chiswick?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What should I think about before starting?

  • The house is exposed while the roof is off, so the sequence is planned tightly.
  • Neighbours’ light and privacy are the main planning tests.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Do you work in Chiswick?

Yes. Chiswick is within our coverage for bungalow and upward extensions, along with nearby Acton and Barnes.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Chiswick.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote