Covering Daventry
Daventry is about 12 miles west of Northampton. We also cover Rugby (9 miles to the north-west), Towcester and Northampton.
Homes in the East Midlands
The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.
What is a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Householder planning application
- Windows, insulation, plastering, electrics and plumbing
- Joining the new first floor to the existing landing
What will a double-storey extension cost?
Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
What approvals does a double-storey extension need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What can change the price or programme?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- Neighbours’ light is assessed using the 45-degree guide many councils use.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Double-storey extensions: common questions
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Do you work in Daventry?
Yes. Daventry is within our coverage for double-storey extensions, along with nearby Rugby and Towcester.
Other towns nearby
- Double-storey extensions in Rugby
- Double-storey extensions in Towcester
- Double-storey extensions in Northampton
- Double-storey extensions in Leamington Spa
Learn more about double-storey extensions, or see every project we cover in Daventry.

