Garden annexes · Airdrie

Garden annexes in Airdrie

Homeowners in Airdrie can get garden annexes from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Airdrie

Alongside Airdrie, we also cover Coatbridge, Motherwell (5 miles to the south) and Cumbernauld.

Homes in Lanarkshire

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What do you get with a garden annexe?

We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.

  • Design and planning application
  • Foundations and drainage connections
  • Heating, hot water and electrics

What will a garden annexe cost?

Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

What approvals does a garden annexe need in Scotland?

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

In Scotland an annexe needs planning permission and a building warrant before work starts.

What can affect a garden annexe?

  • A level threshold and wider doors make the annexe suitable for later life.
  • Council tax treatment depends on who lives there; check with your council.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Garden annexes: common questions

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

Who deals with the council for a project in Airdrie?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Garden annexes in nearby towns

Learn more about garden annexes, or see every project we cover in Airdrie.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote