House renovations · Deal

House renovations in Deal

House renovations for homes in Deal and the surrounding parts of Kent, designed around your house and built by our teams under a single written contract.

Covering Deal

Deal is about 38 miles east of Maidstone. We also cover Dover (8 miles to the south-west), Ramsgate and Broadstairs.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What do you get with a house renovation?

A house renovation brings an older or neglected home up to modern standards: rewiring, new heating, replastering, new kitchen and bathrooms, windows, insulation and often a new layout. It can be done room by room or as one programme while the house is empty.

  • Condition survey and scope of works
  • Rewiring, heating and plumbing
  • Plastering, joinery, kitchen and bathrooms

What will a house renovation cost?

What house renovations typically cost. These are guide ranges; the written quote for your house replaces them.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

Do you need permission for a house renovation in Deal?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.

What should I think about before starting?

  • Older houses can hide timber decay and damp, so we allow a contingency.
  • Living in during a full renovation is difficult; most people move out for part of it.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Can we live in the house during a renovation?

For a light refurbishment, often yes. For a full or structural renovation, most people move out for at least part of the work.

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you work in Deal?

Yes. Deal is within our coverage for house renovations, along with nearby Dover and Ramsgate.

House renovations near Deal

Learn more about house renovations, or see every project we cover in Deal.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote