House renovations · Margate

House renovations in Margate

House renovations in Margate from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Margate

Margate is about 38 miles east of Maidstone. We also cover Broadstairs (3 miles to the south-east), Ramsgate and Deal.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What goes into a house renovation?

A house renovation brings an older or neglected home up to modern standards: rewiring, new heating, replastering, new kitchen and bathrooms, windows, insulation and often a new layout. It can be done room by room or as one programme while the house is empty.

  • Rewiring, heating and plumbing
  • Plastering, joinery, kitchen and bathrooms
  • Decoration and flooring if required

What is the guide price for a house renovation in Margate?

Indicative costs for house renovations. London and the South East usually sit towards the top of each range.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

How is a house renovation approved in Margate?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.

What can affect a house renovation?

  • Houses empty for two years or more can qualify for the reduced 5% VAT rate on renovation.
  • Living in during a full renovation is difficult; most people move out for part of it.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Can we live in the house during a renovation?

For a light refurbishment, often yes. For a full or structural renovation, most people move out for at least part of the work.

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you work in Margate?

Yes. Margate is within our coverage for house renovations, along with nearby Broadstairs and Ramsgate.

Also covering

Learn more about house renovations, or see every project we cover in Margate.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote